It is important that there is a uniform basis for measuring building works in order to facilitate industry wide consistency and benchmarking, to encourage the adoption of best practice and to help avoid disputes.
The Standard Method of Measurement (SMM) is published by the Royal Institution of Chartered Surveyors (RICS). It was first published in 1922, superseding a Scottish Standard Method of Measurement which was published in 1915. It is now in its seventh edition (SMM7), which was first published in 1988 and revised in 1998.
[edit] What is SMM7
SMM7 provides detailed information, classification tables and rules for measuring building works. It is typically used in the preparation of bills of quantities, documents that provide measured quantities of the items of work identified by the drawings and specifications in tender documentation. Bills of quantities are issued to tenderers for them to prepare a price for carrying out works.
Work sections within SMM7 are classified according to the Common Arrangement of Work Sections (CAWS). CAWS creates a consistent arrangement of work sections for specifications and bills of quantities. It was first published in 1987 and was updated by the Construction Project Information Committee (CPIC) in 1998 to align it with the Unified Classification for the Construction Industry (Uniclass).
SMM7 is accompanied by the Code of Procedure for the Measurement of Building Works (the SMM7 Measurement Code). Whilst SMM7 can have a contractual status on a project (for example in the JCT Standard form of Building Contract), the Measurement Code is non-mandatory.
[edit] Replacement of SMM7 with NRM
SMM7 was been replaced by the New Rules of Measurement volume 2 (NRM2) which was published in April 2012 by the RICS Quantity Surveying and Construction Professional Group and became operative on 1 January 2013. SMM7 should not be adopted on projects after July 2013.
NRM2 is accompanied by two additional volumes:
- NRM1: Order of cost estimating and cost planning for capital building works.
- NRM3: Order of cost estimating and cost planning for building maintenance works.
It is suggested by the RICS that together, the new suite of documents will better reflect the way the industry now works:
- Better meeting the needs of clients.
- Providing for more up-front detail.
- Allowing better consideration of the full costs of a construction project (for example marketing costs, fees and charges, the cost of acquiring land, planning costs, relocation costs, the cost of finance, and so on).
- Providing a better method for quantifying risk.
The RICS also suggest that it will facilitate '...greater cross industry working (and) the introduction of Building Information Modelling' (ref. RICS).
NRM has moved away from the Common Arrangement of Work Sections (CAWS) to adopt its own system of indexing.
The New Rules of Measurement are accompanied by the 'Black Book', the QS and construction standards. Together they provide a suite of tools to help the construction industry work more collaboratively and consistently.
Contracts that refer to SMM7 should be revised when NRM is adopted on new projects.
For a detailed comparison of NRM2 and SMM7 see Comparison of SMM7 with NRM2.
[edit] Related articles on Designing Buildings
- Bills of quantities.
- Black book.
- Code of measuring practice.
- Common Arrangement of Work Sections.
- Comparison of SMM7 with NRM2.
- Cost consultant.
- New Rules of Measurement.
- RICS.
- RICS Property Measurement.
- RICS publishes Land Measurement for Planning and Development Purposes.
- Tender.
- Tender documentation.
- Tender pricing document.
- Uniclass.
[edit] External references
- RICS: RICS has released new guidance for quantity surveyors and other members working in the construction sector.
- RICS: NRM 1 and NRM 2 are available.
- NBS video: The New Rules of Measurement.
- RICS QS and construction standards (the Black Book).
- NBS: Coordinating Common Arrangment, Uniclass, NBS and Rules of Measurement.
Featured articles and news
CIOB launches global mental health survey
To address the silent mental health crisis in construction.
New categories in sustainability, health and safety, and emerging talent.
Key takeaways from the BSRIA Briefing 2024
Not just waiting for Net Zero, but driving it.
The ISO answer to what is a digital twin
Talking about digital twins in a more consistent manner.
Top tips and risks to look out for.
New Code of Practice for fire and escape door hardware
Published by GAI and DHF.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, retrofit measures and the roles involved.
New alliance will tackle skills shortage in greater Manchester
The pioneering Electrotechnical Training and Careers Alliance.
Drone data at the edge: three steps to better AI insights
Offering greater accuracy and quicker access to insights.
From fit-out to higher-risk buildings.
Heritage conservation in Calgary
The triple bottom line.
College of West Anglia apprentice wins SkillELECTRIC gold.
Scottish government launch delivery plan
To strengthen planning and tackle the housing emergency.
How people react in ways which tend to restore their comfort.
Comfort is a crucial missing piece of the puzzle.
ECA launches Recharging Electrical Skills Charter in Wales
Best solutions for the industry and electrical skills in Wales.
New homebuilding skills hub launch and industry response
Working with CITB and NHBC to launch fast track training.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.